强激光与粒子束, 2002, 14 (5): 775, 网络出版: 2006-05-15   

Marx发生器建立时间及抖动实验研究

Experimental research on the Marx-generator building time and jitter
作者单位
中国原子能科学研究院,北京,102413
摘要
Marx发生器建立时间及抖动与Marx发生器中球隙开关的工作状态有关,同时与开关的触发电压幅值及极性有关.通过实验获得了Marx发生器建立时间及抖动最小时最佳工作状态的相关参数.天光一号电子束加速器从同步机发出指令信号至主Marx输出,总的延时及抖动为(1629±8.4)ns,满足MOPA系统建立时间抖动小于20ns的要求.
Abstract
Building time and jitter of the Marx generator are mainly depend on work state of spark gap switch during operating. Meanwhile they are related to amplitude and polarity of trigging voltage. The paper briefly describes physical process of conductance of gas spark gap switch. In order to minimize building time and jitter, experiments were performed to optimize work state related parameters of the Marx generator. As result, the total building time and jitter are (1629±8.4)ns for Heaven Ι electron beam accelerator. It fills the jitter requirement of MOPA system less than 20ns.

杨大为, 王有田, 单玉生. Marx发生器建立时间及抖动实验研究[J]. 强激光与粒子束, 2002, 14(5): 775. 杨大为, 王有田, 单玉生. Experimental research on the Marx-generator building time and jitter[J]. High Power Laser and Particle Beams, 2002, 14(5): 775.

本文已被 5 篇论文引用
被引统计数据来源于中国光学期刊网
引用该论文: TXT   |   EndNote

相关论文

加载中...

关于本站 Cookie 的使用提示

中国光学期刊网使用基于 cookie 的技术来更好地为您提供各项服务,点击此处了解我们的隐私策略。 如您需继续使用本网站,请您授权我们使用本地 cookie 来保存部分信息。
全站搜索
您最值得信赖的光电行业旗舰网络服务平台!