强激光与粒子束, 2014, 26 (5): 050201, 网络出版: 2014-06-03   

神光-Ⅲ主机装置MJ级能源系统研制现状

Development status of MJ power conditioning system for SG-Ⅲ laser facility
作者单位
中国工程物理研究院 激光聚变研究中心, 四川 绵阳 621900
引用该论文

齐珍, 陈德怀, 赖贵友, 郭良福, 力一峥, 栾永平, 李冬梅, 周丕璋. 神光-Ⅲ主机装置MJ级能源系统研制现状[J]. 强激光与粒子束, 2014, 26(5): 050201.

Qi Zhen, Chen Dehuai, Lai Guiyou, Guo Liangfu, Li Yizheng, Luan Yongping, Li Dongmei, Zhou Pizhang. Development status of MJ power conditioning system for SG-Ⅲ laser facility[J]. High Power Laser and Particle Beams, 2014, 26(5): 050201.

参考文献

[1] 周丕璋, 郭良福, 陈德怀, 等. 激光聚变主放大器能源系统述评[J]. 强激光与粒子束, 2003, 15(4): 346-351.(Zhou Pizhang, Guo Liangfu, Chen Dehuai, et al. Overview of main amplifier power conditioning for the laser fusion. High Power Laser and Particle Beams, 2003, 15(4): 346-351)

[2] 童金禄, 陈德怀, 齐珍, 等. 强激光能源系统故障保护对策与电磁干扰抑制方法[J]. 中国电机工程学报, 2012, 32(28):97-103. (Tong Jinlu, Chen Dehuai, Qi Zhen, et al. Fault protective measures and EMI depressing approach for power conditioning systems in high power lasers. Proceedings of the CSEE, 2012, 32(28): 97-103)

[3] Newton M. NIF amplifier power conditioning system(PCS) design basis document[R]. California: LLNL National Laboratory, 2002.

[4] Mark A, Newton M. NIF amplifier power conditioning system(PCS) hazard analysis and safety implementation plan[R]. California: LLNL National Laboratory, 2002.

[5] Newton M. Main amplifier power conditioning for the NIF[R]. California: LLNL National Laboratory, 1999.

[6] Hanmmon J, Fulkerson E S, Gagnon B, et al. Safety grounding approach for the National Ignition Facility power conditioning system[C]//13th IEEE International Pulsed Power Conference. 2001.

[7] Larson D W. The impact of high energy density capacitor banks for nuclear fusion applications[C]//9th IEEE International Pulsed Power Conference. 1993.

[8] Bhasavanich D, Hitchcock S S, Creely P M, et al. Development of a compact high-energy spark gap switch and trigger generator system[C]// 8th IEEE International Pulsed Power Conference. 1991: 343-345.

[9] Savage M E, Simpson W W, Sharpe R A, et al. Switch evaluation test system for the National Ignition Facility[C]// 11th IEEE International Pulsed Power Conference. 1997.

[10] Savage M E. Final results from the high-current, high-action closing switch test program at Sandia National Laboratories[J]. IEEE Trans on Plasma Science, 2000, 28(5):1451-1455.

[11] 赖贵友, 郭良福, 力一峥, 等. 大电流两电极气体开关研究[J]. 强激光与粒子束, 2006, 18(6):1037-1040.(Lai Guiyou, Guo Liangfu, Li Yizheng, et al. High current two-electrode gas switch. High Power Laser and Particle Beams, 2006, 18(6): 1037-1040)

[12] 郭良福, 周圣, 李志鹏, 等. 高库仑大电流两电极气体火花开关研究[J]. 强激光与粒子束, 2007, 19(5): 877-880.(Guo Liangfu, Zhou Sheng, Li Zhipeng, et al. High coulomb and high current gas spark switch. High Power Laser and Particle Beams, 2007, 19(5): 877-880)

[13] 郭良福, 何孟兵, 周圣, 等. 强激光能源系统用气体开关的研究[J]. 高电压技术, 2007, 33(2): 66-70.(Guo Liangfu, He Mengbing, Zhou Sheng, et al. Research on gas spark switch for high power laser system. High Voltage Engineering, 2007, 33 (2): 66-70)

[14] 赖贵友, 杨兰均, 郭良福, 等. 大库仑两电极气体开关静态特性研究[J]. 强激光与粒子束, 2009, 21(1): 43-46.(Lai Guiyou, Yang Lanjun, Guo Liangfu, et al. Static characteristic research on high-coulomb two-electrode spark gap switch. High Power Laser and Particle Beams, 2009, 21(1): 43-46)

[15] 李黎, 刘刚, 林福昌, 等. 石墨型高能气体开关的电极使用寿命分析[J]. 中国电机工程学报, 2011, 31(6): 109-115.(Li Li, Liu Gang, Ling Fuchang, et al. Analysis on electrode lifetime of high power graphite spark gap switch. Proceedings of the CSEE, 2011, 31(6): 109-115)

齐珍, 陈德怀, 赖贵友, 郭良福, 力一峥, 栾永平, 李冬梅, 周丕璋. 神光-Ⅲ主机装置MJ级能源系统研制现状[J]. 强激光与粒子束, 2014, 26(5): 050201. Qi Zhen, Chen Dehuai, Lai Guiyou, Guo Liangfu, Li Yizheng, Luan Yongping, Li Dongmei, Zhou Pizhang. Development status of MJ power conditioning system for SG-Ⅲ laser facility[J]. High Power Laser and Particle Beams, 2014, 26(5): 050201.

本文已被 1 篇论文引用
被引统计数据来源于中国光学期刊网
引用该论文: TXT   |   EndNote

相关论文

加载中...

关于本站 Cookie 的使用提示

中国光学期刊网使用基于 cookie 的技术来更好地为您提供各项服务,点击此处了解我们的隐私策略。 如您需继续使用本网站,请您授权我们使用本地 cookie 来保存部分信息。
全站搜索
您最值得信赖的光电行业旗舰网络服务平台!