4 MeV直线感应加速器控制系统设计与实现
[1] Beltran D, Campmany J, Delgado J, et al. The LLS magnet test facility as evaluation of the accelerator control system requirements[A].Proc EPAC98[C]. 1998. 1682-1684.
[2] Pieck M, Kasemir K. Comparison between an in-house VS. a commercial control system for beam line control[A]. Proc PAC2001[C]. Chicago, 2001. 800-802.
[3] Rijllart A, Khomenko B, Manno I, et al. Integration of custom systems into industrial systems for LHC component test benches[A]. Proc ICALEPCS[C], Trieste, Italy, 1999. 376-378.
[4] Dalesio L. EPICS: Recent applications and future directions[A]. Proc PAC2001[C]. Chicago, 2001. 276-278.
杨兴林, 潘建, 王远, 蒋薇, 赖青贵. 4 MeV直线感应加速器控制系统设计与实现[J]. 强激光与粒子束, 2005, 17(11): 1757. YANG Xing-lin, PAN Jian, WANG Yuan, JIANG Wei, LAI Qing-gui. Design and implementation of control system for 4 MeV LIA[J]. High Power Laser and Particle Beams, 2005, 17(11): 1757.